₹32.05
▲ +0.13 +0.41%
As of 28 Jul 2026 · delayed
NSE Listed · Construction
ESM · ESM 1What does ESM · ESM 1 mean?
BSE · Enhanced Surveillance Measure (ESM 1)ESM is the micro/small-cap ramp brake: it fires when a sub-₹1000cr stock's price variation is extreme versus its peer universe, or it's loss-making with a stretched valuation. Practical meaning: intraday speculation is shut off (Trade-for-Trade — every purchase must be taken to delivery), margins go to 100%, and at Stage II price discovery moves to periodic call auctions inside a 2% band.Criteria: Micro / small-cap companies (main-board market-cap below ₹500 cr) shortlisted on objective price parameters — high-low price variation, close-to-close price variation and standard deviation. Stage I = 100% margin + a ≤5% price band + Trade-for-Trade; Stage II = a 2% price band + periodic call auction.Exchange notice · 2026-04-30
NSE · Enhanced Surveillance Measure (ESM 1)ESM is the micro/small-cap ramp brake: it fires when a sub-₹1000cr stock's price variation is extreme versus its peer universe, or it's loss-making with a stretched valuation. Practical meaning: intraday speculation is shut off (Trade-for-Trade — every purchase must be taken to delivery), margins go to 100%, and at Stage II price discovery moves to periodic call auctions inside a 2% band.Criteria: Micro / small-cap companies (main-board market-cap below ₹500 cr) shortlisted on objective price parameters — high-low price variation, close-to-close price variation and standard deviation. Stage I = 100% margin + a ≤5% price band + Trade-for-Trade; Stage II = a 2% price band + periodic call auction.Exchange notice · 2026-07-14
Vascon Engineers Ltd. (VASCONEQ)
Volume: 80,350Avg Vol 1W: 95,739Avg Vol 1M: 1,39,38052W Range:₹26.75₹74.59
More stocks
Prices are delayed/indicative; pros & cons are AI generated. Informational only — not investment advice. ← Back to search