₹141.92
▲ +9.02 +6.79%
As of 29 Jul 2026 · delayed
BSE Listed · Construction
ST-ASM · ASM 1What does ST-ASM · ASM 1 mean?
BSE · Short Term Additional Surveillance Measure (ASM 1)ST-ASM catches short bursts: a beta-adjusted close-to-close move beyond ±25% in 5 trading days (or ±40% in 15) combined with concentrated trading — or a 75%+ monthly range with fewer than 100–200 unique traders. Practical meaning: margins jump to 50–100% for a few weeks to cool a spike; it either lapses quickly or escalates into LT-ASM if the move sustains.Criteria: Short-term (5 / 15 / 30-day) price-volume abnormality — high-low and close-to-close price variation over the window. Adds 100% margin and a 5% (then 2%) price band.Exchange notice · 2026-07-23
Alpine Housing Development Corporation Ltd. (526519)
Volume: 4,876Avg Vol 1W: 5,857Avg Vol 1M: 5,15352W Range:₹74.12₹180
More stocks
Rishiroop LimitedPromact Plastics LimitedSterling Green Woods Ltd.Dolphin Medical Services Ltd.Systematix Corporate ServicesShahi Shipping LimitedWorldwide Aluminium LimitedIIRM Holdings India LimitedSquare Four Projects India Ltd.SGL Resources LimitedChoksi Laboratories Ltd.Country Club HospitalityAll “52” stocks →
Prices are delayed/indicative; pros & cons are AI generated. Informational only — not investment advice. ← Back to search